So was he.
"Four hours to pull the axis, clean the bearing, repack it, and recal. Plus two hours for the lube system flush."
The Fanuc controller booted with its familiar, almost gentle chime. Green lights. No red.
He pressed . The machine was ready.
He typed in MDI: G91 G01 Z-10. F500. Cycle start.