She changed one cell. The entire sheet rippled. New thickness, new effective depth, new shear capacities. Column C-7 dropped to 0.92. Green. The now showed 18 mm—acceptable.
"Show me," he said.
Six months later, the Riverview Medical Center’s mat foundation was poured—12,000 cubic meters of concrete in a single 18-hour continuous operation. Sensors embedded in the mat streamed data back to Maya’s office. mat foundation design spreadsheet