A) ASME Section I – Power Boilers Question 3 – Combustion (Efficiency) A natural gas boiler operates with 15% excess air. The flue gas O₂ reading is 3.2%. Is this consistent? Show why or why not.

A) Efficiency increases (higher mean temperature of heat addition) Question 5 – Water Treatment (Phosphate Treatment) What is the main purpose of coordinated phosphate/pH control in a high-pressure boiler? A) Prevent silica carryover B) Prevent caustic gouging and acid phosphate corrosion C) Remove dissolved oxygen D) Reduce total dissolved solids

( \frac1U_o = \frac150 + \frac0.083 \times 0.1022×45 + \frac0.0831500 × 0.075 ) ( = 0.02 + \frac0.00846690 + \frac0.083112.5 ) ( = 0.02 + 0.000094 + 0.000738 ) ( = 0.020832 )

C) 425°C – 550°C (above 400°C for carbon steel) Question 8 – Boiler Operation (Hydrostatic Test) After a major boiler repair, you perform a hydrostatic test. The test pressure for a power boiler per ASME Section I should be: A) 1.25 × MAWP B) 1.5 × MAWP C) 2.0 × MAWP D) MAWP + 100 psi

A) ASME Section I – Power Boilers Question 3 – Combustion (Efficiency) A natural gas boiler operates with 15% excess air. The flue gas O₂ reading is 3.2%. Is this consistent? Show why or why not.

A) Efficiency increases (higher mean temperature of heat addition) Question 5 – Water Treatment (Phosphate Treatment) What is the main purpose of coordinated phosphate/pH control in a high-pressure boiler? A) Prevent silica carryover B) Prevent caustic gouging and acid phosphate corrosion C) Remove dissolved oxygen D) Reduce total dissolved solids power engineering 3b1 exam questions

( \frac1U_o = \frac150 + \frac0.083 \times 0.1022×45 + \frac0.0831500 × 0.075 ) ( = 0.02 + \frac0.00846690 + \frac0.083112.5 ) ( = 0.02 + 0.000094 + 0.000738 ) ( = 0.020832 ) A) ASME Section I – Power Boilers Question

C) 425°C – 550°C (above 400°C for carbon steel) Question 8 – Boiler Operation (Hydrostatic Test) After a major boiler repair, you perform a hydrostatic test. The test pressure for a power boiler per ASME Section I should be: A) 1.25 × MAWP B) 1.5 × MAWP C) 2.0 × MAWP D) MAWP + 100 psi Show why or why not