Saudi Aramco Schedule G Guide
Use this if your report is about upgrading a facility (like a rig) to meet Saudi Aramco's "Schedule G" standards [1, 2]. Drafting Structure: Project Scope: Detail the specific upgrades (e.g., helideck modifications
Depending on your specific needs, here are two ways to draft this report. Option 1: HSE Compliance Report (Standard Use)
If referencing specific manuals, use the document number (e.g., SA-DWO-HSERM-002-R0 ) to show technical accuracy [5]. Focus on Responsibility: Explicitly state which materials were Company Provided saudi aramco schedule g
versus Contractor Provided to avoid liability confusion [7]. Use Proper Channels: For any project-specific questions, consult the Saudi Aramco Supplier Portal for the most current templates [12]. Are you drafting this for a safety audit weekly progress update for a construction project?
Use this if you are reporting on a project's adherence to safety protocols as defined by Saudi Aramco's Health, Safety, and Environmental Requirements Manual Focus Areas Executive Summary Use this if your report is about upgrading
requirements that a contractor must follow [5, 7]. Specifically, it often outlines the materials, tools, and equipment
In Saudi Aramco contracts, Schedule G traditionally covers the Health, Safety, and Environmental (HSE) Use this if you are reporting on a
Brief overview of the project's safety performance and any major Schedule G milestones reached. Asset Management Tracking of company-provided tools and equipment (as per Schedule G Attachment Regulatory Compliance Confirmation that all equipment meets and Aramco's Well Control Manual where applicable [5]. Incident Reporting Summary of any safety incidents reported via Aramco Emergency Protocols (e.g., dialing 110 for emergencies) [10]. Action Plan