Slump test – every 50m³. Cube test – 3 cubes per 50m³, tested at 7 & 28 days (MS 26).
a) Formwork – Rigid, true to line and level, removal time as per Table 7.4.4(a). b) Placing – Max free fall 1.5m, no segregation. c) Compaction – Mechanical vibrator, not contacting reinforcement. d) Curing – Minimum 7 days wet hessian or curing compound. standard specification for building works 2020 jkr pdf
Cover to reinforcement ±5mm, member thickness +10mm/-5mm. Slump test – every 50m³
Measured in cubic metres (m³) of completed in-place concrete. Separate payment for formwork and reinforcement. No separate payment for curing. 4. Formatting for Professional Documents | Element | Style | |---------|-------| | Font | Arial 11pt (text), Arial 12pt bold (headings) | | Margins | Left 25mm, Right 15mm, Top 20mm, Bottom 20mm | | Clause numbering | Decimal system (e.g., 7.4.1) | | Tables | Numbered by clause (Table 7.4.4(a)) | | Cross-references | Clause number in bold | Legal Note If you are preparing a contract document , you must use the official JKR 2020 PDF directly. The above example is for reference only. Unauthorized reproduction or redistribution of JKR specifications is prohibited under Malaysian copyright law (Akta Hak Cipta 1987). b) Placing – Max free fall 1